As all standard floors of the apartment building complex in Schäffergasse have been built in the meantime, the work on the top floor could be started. The walls in the first top floor have already been completely concreted. The ceiling formwork has also been almost completed in the meantime, so that the reinforcement of the ceiling above the first top floor can now be built. At the same time, the drywall has been erected up to the second upper floor. The windows have also been installed up to the third floor.