In Schäffergasse, clear construction progress can be seen on the top floor. The ceiling above the first attic floor has now been completely concreted. Now the concreting of the walls on the second floor is starting. The precast elements that will be used for this have already been assembled and erected. At the same time, the formwork for the ceiling is starting.