The focus is now on completing the remaining tasks on time. Façade cladding has been largely completed on both the street and courtyard sides.
The substructures of the greenery system have been partially completed with the water pipes of the automatic supply and drainage system.
The terraces and balconies associated with the residential units are also taking on their final form, with the installation of railings and the laying of external flooring.
Inside the apartments, the last walls are being plastered, the bathrooms are being tiled, the sanitary fittings are being installed and the parquet flooring is being laid.
At the same time, ceiling lights and doors are being installed in the communal areas. It won’t be long before the well-planned floor plans are transformed into the ideal home.